Latner Documentation

Half Day/Daily/Weekly Pricing

Half Day/Daily/Weekly Pricing adds a short-hire rate to Daily/Weekly Pricing, so a machine that comes back within a few hours is charged a half day instead of a full day.

Overview

Plenty of counter hires are over by lunchtime: a concrete saw for a morning, a trailer for a couple of hours. Charging those a full day feels heavy-handed, and asking staff to discount them by hand is how mistakes happen. This pricing method gives the line a third rate that applies automatically when the whole hire fits inside your half day window.

  • A rate row carries exactly three rates: the Half Day rate, a daily rate and a weekly rate.

  • If the equipment goes back within Half Day Rate Hours of going out (plus the grace period), the whole hire is charged the Half Day rate, once.

  • Anything longer prices exactly like Daily/Weekly Pricing: the cheaper of the daily and weekly rates, with the Half Day rate ignored.

  • You can rename the rate with the Half Day Rate Label setting - set it to 4 Hour and the rate, the pricing method and the invoice line all say 4 Hour instead of Half Day.

  • It is for customer billing only. A Sub Hire supplier rate does not offer it.

Before You Begin

Requirement

Where to Find It

Allowed Pricing Methods either empty or including Half Day/Daily/Weekly

Security › Settings › Rental

Half Day Rate Hours - the hours the Half Day rate covers. Defaults to 4

Security › Settings › Rental

Half Day Rate Grace Period (Minutes) - how far past those hours a return can run and still be a half day. Left blank, it is 0

Security › Settings › Rental

Half Day Rate Label - optional, the name shown for the rate (for example 4 Hour). Defaults to Half Day

Security › Settings › Rental

The three settings apply to every Half Day rate in the business. You cannot have a 4 hour block on one machine and a 5 hour block on another.

Setting Up a Half Day Rate

Step 1 - Add a rate row

Open the rate book from Rental › Configuration › Rental Rates and choose Options › Add Rate Details. Pick the Line Type and the Equipment Class, plus a model or unit if the rate is that specific.

Step 2 - Select Half Day/Daily/Weekly Pricing

Choose Half Day/Daily/Weekly Pricing (it carries your Half Day Rate Label if you have set one). Three rate rows appear: the first is fixed to the Half Day rate type, the second offers the daily rate types and the third the weekly ones.

Step 3 - Enter the three rates and save

Fill in a Rental Rate for each row, with optional Floor Rates, and click Save. Contract and quote lines added for that class from then on pick up all three rates.

How It Charges

The Half Day rate is only ever charged for a whole hire whose end is known:

  • On the invoice that bills up to the off hire, Latner measures from the on hire time to the actual off hire time. If that is more than zero and no longer than Half Day Rate Hours plus the grace period, the hire bills the Half Day rate once.

  • On an Advance or Pro Forma invoice billed to the expected off hire date, it measures to the expected off hire time instead - so a counter hire invoiced up front at the Half Day rate is topped up to the daily rate on return if it came back late.

  • On a progress invoice, or any period that is not the whole hire, the Half Day rate is never used and the line prices as Daily/Weekly.

  • Overnight - a short hire that crosses midnight is still one block.

The Minimum Charge still applies to a Half Day hire, and a Half Day hire that is fully stood down bills nothing.

Worked example

A concrete saw with Half Day $60.00, Daily $100.00 and Weekly $400.00. Half Day Rate Hours is 4 and the grace period is 30 minutes. It goes on hire at 8:00am.

  • Returned at 11:00am - 3 hours, inside the block: $60.00.

  • Returned at 12:20pm - 4 hours 20 minutes, inside the 4 hours plus 30 minutes grace: $60.00.

  • Returned at 1:00pm - 5 hours, past the grace period, so the hire prices as Daily/Weekly: $100.00.

  • Invoiced in advance at $60.00 for an expected 10:00am return, then returned at 1:00pm - the return invoice bills the $40.00 difference to the daily rate.

On the Invoice

  • Rate Type - your Half Day Rate Label (Half Day unless you have changed it). Rental Rate - the Half Day rate.

  • Billable Days - 0.5. Billable Units on the Create Invoice screen and PDFs shows the label, for example 4 Hour.

  • Calc. Daily Rate and Adj. Daily Rate - left blank, because a half day is one block, not days times a daily rate.

  • A longer hire on the same line shows the daily or weekly rate and its fields exactly as on Daily/Weekly Pricing.

A Rental Rate Adjustment cannot move a line onto the Half Day rate - Latner refuses it with "<label> rates cannot be applied as an adjustment", for example 4 Hour rates cannot be applied as an adjustment. Adjust the daily or weekly rate instead.

FAQs

Half Day/Daily/Weekly Pricing isn't in the Pricing Method list. Why?

Either the Allowed Pricing Methods setting is populated and does not include it, or you are on a Sub Hire supplier rate, where it is not offered.

The machine was back in under four hours but the invoice charged a full day. Why?

Check three things. The return must be within Half Day Rate Hours plus the grace period of the on hire time, measured in hours and minutes, not by date. The invoice must be the one that bills up to the off hire - a progress invoice never uses the Half Day rate. And the line must be on Half Day/Daily/Weekly Pricing with a Half Day rate - a line added before the rate book changed keeps the pricing it was added with.

Can the Half Day rate apply to the last few hours of a longer hire?

No. It only ever prices a whole hire that fits inside the block. A hire of a day and a half bills as Daily/Weekly - two days, or the weekly rate if that is cheaper.

How do I call it a 4 Hour rate instead of Half Day?

Set Half Day Rate Label in Security › Settings › Rental to 4 Hour. The rate type, the pricing method name and the invoice line all use the label. If the block should be four hours long, check Half Day Rate Hours is 4 as well.

Does a Minimum Charge apply to a Half Day hire?

Yes. If the line has a Minimum Charge above the Half Day rate, the off hire invoice charges the Minimum Charge. See Rate Modifiers.